Core Cable Contractors were instructed to install all cabling associated with the capacity 25 expansion and enhancement project. Core will be installing 100km of cable including communication, Instrumentation, LV and HV cables.

This project required an onsite management team which integrates with the cap 25 team to ensure the project runs to schedule.

National Grid

r-project-image

Core Cable Contractors were instructed to install, gland and terminate all the sub main and earth cables in the redevelopment of the Anfield Road stand at Liverpool Football club. These cables range from 25mm 4 core SWA to 240mm 4 core SWA cables. The upgraded stand added 7000 additional seats which boosted the stadium capacity to 61000

We had to overcome several challenges with this project including night working and keeping the sound level to a minimum due to the close proximity of local residents. Core completed the works within the client’s strict time-frame to have the stand ready for the 2024/25 season.

Liverpool Football Club

r-project-image

Core Cable Contractors were instructed by close working partner to carry out installation on numerous Anglian Water project. This is part of Anglian Waters programme of works to upgrade the efficacy of the water treatments at a total cost of £1.2 billion over the next 5 years.

Core installed all types of cabling from fibre optic, instrumentation and mains power cables. Cables were installed using several different techniques including working at height and confined space.

Anglian Water